Section 1 Preliminary Considerations Pages 3–6 Seven factors to be cognizant of at this stage are: suitability of the site for the proposed works, economic and adequacy of design, optimum method of construction with reference to potential issues due to ground and groundwater. BS5930:2015 is a further full revision of the standard, and introduces some principal changes including: compliance with BS EN 1997-1 and BS EN 1997-2 and related test standards new information on geophysical surveying and ground testing, and updated guidance on desk studies, field reconnaissance, ground investigations on contaminated ground and ground affected by voids the requirements of data capture in the field and in the inclusion of this in reporting. BS5930:1999 was amended in December 2007 to avoid conflict with the newly introduced 'Geotechnical Design' and the code is to be retained as a normative reference. The document gives guidance on legal, environmental and technical matters relating to and includes a section on the description and classification of and.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |